Veris-technologies OpticMapper - Field Reference Guide Instrukcja Użytkownika

Przeglądaj online lub pobierz Instrukcja Użytkownika dla Ekwipunek Veris-technologies OpticMapper - Field Reference Guide. Veris Technologies OpticMapper - Field Reference Guide User Manual Instrukcja obsługi

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 2
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 0
4. Install test load on OpticMapper external controller rear
panelport marked Optical Power port. Turn power on and go
to data acquisition mode on DataLogger or SoilViewer.
5. Clean sapphire window and install test reference under
window. Click OM System check on Soilveiwer, or press 2
on Datalogger for OM System Check. Follow onscreen
instructions. Reference values bellow.
Sensor 1: Difference of 200 or > between dark and light reference.
Sensor 2: Difference of 90 or > between dark and light reference.
6. Lower gauge wheels so EC
coulters and optical row unit
penetrate to desired depth.
7. Adjust top-link so implement
operates level in field position;
in rocky conditions shorten
top-link and tip implement
slightly forward to reduce
pressure on window; if soil
adheres to window, lengthen
top-link to increase pressure
on window.
OM values should be:
Sensor 1: 833
Sensor 2: 289
Readings are acceptable if
within 10 numbers from these.
Field Reference GuideOpticMapper
Keep with OpticMapper and refer to daily.
(Refer to Operating Instruction Manual for complete instructions)
1. Inspect unit for loose
or missing bolts, other
obvious problems
2. Do side depth wheels and
disks rotate freely? If not, clear
mud or other obstructions.
3. Check wear plate and window for excessive wear or
damage
STEP I. PRIOR TO MAPPING: PERFORM ROUTINE
DAILY MAINTENANCE
Field operations: (note: in-field adjustments may cause
shifts in sensor data)
Przeglądanie stron 0
1 2

Podsumowanie treści

Strona 1

4. Install test load on OpticMapper external controller rear panel—port marked Optical Power port. Turn power on and go to data acquisition mode on Da

Strona 2

When mapping:• check depth of sensor; add weights or adjust down-pressure on row unit if needed• view OM data when unit is raised; are values within 1

Komentarze do niniejszej Instrukcji

Brak uwag