Veris-technologies 3150 Soil EC Mapping System - Operating Instructio Instrukcja Użytkownika Strona 19

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 61
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 18
Pub. # OM17-EC
3-1
Section 3
Implement Overview and Set-up (3100 shown)
Figure 1.
If the unit is crated, the tongue must be installed prior to use. To do so, please take precautions to
ensure that the framework is properly supported to ensure safety.
1) Remove bands that attach tongue and framework to shipping pallet.
2) Use a forklift or small loader to raise front portion of tongue into level position and properly
support with a sawhorse or other support of your choice.
Figure 2.
Ratchet for
raising/lowering
Signal Cable quick-
connect coupler port
Jack location for
implement storage
Weights
Road kit: stop, turn,
and clearance lights
Coulter
electrodes
Tongue
Implement
hitch (2” ball)
Jack location for
field operation
Rockshaft and
frame
4-bolt hubs and P205
R75 highway tires
Support
here
Przeglądanie stron 18
1 2 ... 14 15 16 17 18 19 20 21 22 23 24 ... 60 61

Komentarze do niniejszej Instrukcji

Brak uwag