Veris-technologies 3150 Soil EC Mapping System - Operating Instructio Instrukcja Użytkownika Strona 54

  • Pobierz
  • Dodaj do moich podręczników
  • Drukuj
  • Strona
    / 61
  • Spis treści
  • BOOKMARKI
  • Oceniono. / 5. Na podstawie oceny klientów
Przeglądanie stron 53
Pub. # OM17-EC
6-20
Procedure #7: Lubrication
• Pinch point hazard: to prevent injury, stand clear when raising or lowering any part of the Veris
MSP. Disengage automatic cycling function before working around unit.
• Install all transport locks before transporting or working underneath.
Rockshaft pivot points Each pivot (located at the left and right) contains
an upper and lower grease zerk. Due to the limited motion of the
rockshaft, these should be lubricated on 20-hour intervals. This may
vary based on the number of times the unit is raised and lowered.
Figure 7.1
Rachet jack -- 20 hour intervals
Figure 7.2
Electrode coulters Pivot --In all but the most extremely rocky conditions, the coulter electrodes
should not flex in the field, thus minimal movement will be realized at the pivot. 80-hour
intervals should be sufficient.
Pivot grease
zerks (2 per
hangar; 4 total )
grease zerks
Przeglądanie stron 53
1 2 ... 49 50 51 52 53 54 55 56 57 58 59 60 61

Komentarze do niniejszej Instrukcji

Brak uwag